(more articles at the end of the description)
👉The pictures are large:https://bit.ly/3hUZLnA
‼We recommend to the project leaders and the government that those facilities that cannot be built in Városliget due to left-handedness be built in Debrecen, Szolnok, Nyíregyháza, Győr, Sopron or any other city free from liberal dictatorships!
‼There are always those who describe it as “prefer to build a hospital” or anything else that is just out of the question. For their sake, we made a video that starts with health care, continues with education, and then covers road construction, public transportation, historic buildings, churches, nurseries, public spaces, and settlement development.
20 minutes of concise reality! It also includes some elements of the Liger Project.https://www.facebook.com/szamokadatok/videos/263391675129773
It is quite clear that the left wants to see a run-down, grassy City Park full of drug addicts and prostitutes, as its images in a visible state make the Grove tidy, clean, family-friendly, and used only for its intended purpose. The left likes to fish in the confused, they don’t like it. They filled their heads with the lie that "Fidesz is concreting the Grove", while the reality is that the green area of the Grove will increase from 60 percent to 65 percent if the Project is implemented according to the original plans. One symbolic example of this is the recently handed over underground garage, which used to be a huge surface, paved car park, and now cars are parked underground and green areas have been created on the surface.
👉The Liget Budapest Project has closed the most successful year in its history! In 2020, the public was able to take possession of the Városliget Sports Center and the two-kilometer Running Circle, the Mőcsényi Mihály Botanical Garden and the Park with another Dog Adventure Park.
With this, almost 150,000 m2 of green space in the park has been renewed. László Baán, the ministerial commissioner of the project, emphasized that the car decommissioning of Városliget reached a milestone last year, we handed over the Dózsa Györgyi út Museum Underground Garage, on the surface of which the Városliget Promenade awaits visitors. Occupying the paved area occupied by cars that had been parked for decades, a cozy promenade was created, with more than ten thousand square meters of new green space.
It is no longer about the plans, but the reality of the Liget project that the one and a half million visitors who viewed the developments of the project so far could form an opinion.
WHAT DOES 2021?
➡The historic renovation of Városliget will continue in 2021 with exciting innovations, as the House of Hungarian Music, one of the most remarkable contemporary buildings in the world and recognized by prestigious international awards, will open by the end of this year.
In the next phase of the park rehabilitation, the former historical entrance of the park, the Rondó, will be renewed and regain its old light. In the autumn of 2021, a new cultural institution, the Csillagerőd in Komárom, will be opened to the general public with a unique and spectacular exhibition.
The handovers in the City Park will continue in 2021 as well
By the end of the year, the House of Hungarian Music will open its doors, and a new cultural institution, the Csillagerőd in Komárom, will be opened to the general public within the framework of the Liget project.
The Liget Budapest Project has closed the most successful year in its history so far, announced László Baán, the ministerial commissioner of the project, in a statement sent to our newspaper. Presenting the results achieved in 2020, he said that last year the public could take possession of the Városliget Sports Center and the two-kilometer Running Circle, the Mőály Mőcsényi Botanical Garden and the Park with another Dog Adventure Park. With this, almost 150,000 square meters of green space in the park has been renewed.
The Minister emphasized that the car decommissioning of Városliget also reached a milestone last year, the Dózsa Györgyi út Museum Underground Garage was handed over, on the surface of which the Városliget Promenade awaits visitors. Occupying the paved area occupied by cars that had been parked for decades, a cozy promenade was created, with more than ten thousand square meters of new green space.
Picture: Underground garage:https://bit.ly/3nrkfFv
CNN is also waiting for the building to be completed
In the next phase of the park rehabilitation, the former historical entrance of the park, the Rondó, will be renewed and regain its old light. In the autumn of 2021, a new cultural institution, the Csillagerőd in Komárom, will be opened to the general public with a unique and spectacular exhibition.
Picture: The Star Fortress in Komárom:https://bit.ly/3biAu5s
“By the end of 2021, the House of Hungarian Music, the music initiating institution recognized with several prestigious international awards, will open its doors. The house, designed by Japanese star architect Sou Fujimoto, has also been ranked among the most anticipated buildings in the world in 2021 by American CNN. Construction of the house is progressing well, with its organically undulating, perforated roof structure and huge glass walls without horizontal structural divisions in all of Europe already visible in the park, and construction of a permanent exhibition will begin in the spring. ” - emphasized Benedek Gyorgyevics, CEO of Városliget Zrt., Entrusted with the implementation of the Liget Budapest Project.
Picture: House of Hungarian Musichttps://bit.ly/2XnzzIz
In 2020, the award-winning building of the new Ethnographic Museum reached its highest point. The construction of the institution under the Liget Budapest Project is proceeding at a good pace on the site of the former car park, 56. The arched structure of the building, which will form two hillsides, can already be seen, while the underground floors, which also house exhibition spaces, are already undergoing professional work. The building of the Ethnographic Museum was already ready for construction last autumn, the new institution will be available to visitors in the spring of 2022.
Picture: The Ethnographic Museum:https://bit.ly/3hXqvDI
These park developments are expected this year in Városliget
The landscape architectural renovation of Városliget will also continue, thanks to which the former historical entrance of the park, the Rondó, will be renewed and regain its old light, the Városliget Promenade will be added with a new section, and the park developments Benedek Gyorgyevics.
The rehabilitation of the area is also of historical significance, as the plans for the reconstruction of the park part were made by Garten Studio, one of the best landscape architects in Hungary, in the original XIX. He made the plans of the beginning of the 19th century using the site plans of Heinrich Nebbien.
Picture: Millennium House and Rose Gardenhttps://bit.ly/2Xo8XXU
The construction of the Városliget Promenade, the first section of which, above the Museum's Underground Garage, was handed over to the general public at the end of last year will also continue.
In the next phase, with the construction of the section between the Ethnographic Museum and the Art Gallery, the former Parade Square will be transformed into a full-length walkway, and the former car parked on more than a thousand surfaces will disappear permanently.
The elements of the renewed Városliget handed over so far enjoyed great popularity in 2020, the implemented developments have already attracted more than one and a half million visitors.
These contractors contributed to the development of the City Park
We have previously reported in detail on the above-mentioned projects:
‼Attention! He's not a "shooter," so he wasn't even objected to by left-liberal sham propaganda.
The project of the Romanian hall and related spaces of the Museum of Fine Arts was carried out by Magyar Építő Zrt.
The Ethnographic Museum is being built by ZÁÉV Zrt. And Magyar Építő Zrt. In the Fifty-six.
The value-saving and job-creating work of the Millennium House was carried out by Épkar Zrt.
The underground garage next to Városliget (Dózsa György út) was implemented by WEST HUNGÁRIA BAU Kft. As the main contractor and Épszerk-Pannónia Invest Kft. As the structural subcontractor.
The National Museum Restoration and Storage Center (OMRRK) was built by Strabag-MML High and Engineering Facility Construction Ltd.
In the Városliget Sportcentrum, the construction of the sports field was carried out by Árla Kft.
The House of Hungarian Music will be realized by Magyar Építő Zrt.
The value-saving and demonstration work of the Csillagerőd in Komárom was carried out by a consortium of Épkar Zrt., Fertődi Építő és Szolgáltató Zrt. And WEST HUNGÁRIA BAU Kft.
In the projects, the implementation and technical control tasks were performed by Óbuda Újlak Zrt. And the Liget Engineering Consortium formed by Főber Zrt.
Related articles:
📌Hungary is renewed! The Star Fortress in Komárom will open later this year
https://szamokadatok.hu/Post/2649/Magyarorszag_megujul_Meg_iden_megnyilik_a_komaromi_Csillagerod
📌The National Museum Restoration and Storage Center has started operating
https://szamokadatok.hu/Post/2492/Megkezdte_mukodeset_az_Orszagos_Muzeumi_Restauralasi_es_Raktarozasi_Kozpont
📌The Underground Garage has been handed over, the Grove will be quieter
https://szamokadatok.hu/Post/2445/Atadtak_a_Melygarazst_csendosabb_lesz_a_Liget
📌These are also improvements - only these were not realized (they were solved during the construction of the hospital, but the Liget 3 building is still obstructed)
https://szamokadatok.hu/Post/2002/Ezek_is_fejlesztesek_-_csak_ezek_nem_valosultak_meg
📌Universal anarchists of the left
https://szamokadatok.hu/Post/1216/Ismet_felbukkant_a_balliberalis_anarchista_G-Ras_azaz_Komaromy_Gergely
📌The Liget project will increase the proportion of green space from 60% to 65%
https://szamokadatok.hu/Post/1209/A_Liget-projekt_60-rol_65-ra_emeli_a_zoldterulet_aranyat
📌The reconstruction of the Museum of Fine Arts implemented within the framework of the Liget Project was recognized with the Europa Nostra Prize!
https://szamokadatok.hu/Post/1003/Europa_Nostra-dijjal_ismertek_el_a_Szepmuveszeti_Muzeum_rekonstrukciojat
📌The construction of the Hungarian House of Music is progressing well
https://szamokadatok.hu/Post/798/Jo_utemben_halad_a_Magyar_Zene_Haza_kivitelezese
📌Numbers - the Liget Budapest Project
https://szamokadatok.hu/Post/87/Szamok_-_a_Liget_Budapest_Projekt
Source:https://magyarepitok.hu/mi-epul/2021/01/2021-ben-is-folytatodnak-az-atadasok-a-varosliget
https://www.facebook.com/miligetunk/posts/2717716401814174