Hypocrisy on the left, scam of voters!
Before 2010, tax cuts were promised, and a tax increase was over. Now a "green" program has been promised, clean air is planned, instead plugs, smog and concreting of the remaining green space are planned

The left hasn’t changed anything, we already knew, and we’re showing something to those who don’t see it.
Gergely Karácsony's election program,
👉2. side
"Let 's take our future back!
clean air, the trees, the parks, which are all lost in lasso and, if left untreated, concreted. That's our duty, or our children will be born in a city where it's not good to live. "
👉31. side
We prevent the merging of the city districts and the construction of the green areas that separate them and provide the city with a respite.
https://parbeszedmagyarorszagert.hu/files/public/budapest_mindenkie_1.pdf
Nice words, right?
And what happens now?
Real estate exchange, commission system, looting of Budapest.
THEY HAVE PLANS READY TO CONCRETE THE MOSSER!
Balázs Búswritten by:
The Mocsáros mutyi continues! Another secret document reveals the lies of Gergely Karácsony and Tímea Szabó!
This is the real estate development proposal of the capital for the incorporation of the Mocsáros vineyard:https://ujrainditjuk.hu/wp-content/uploads/2021/12/MOCSAROS_DULO_2020.pdf
"The real estate development proposal was compiled in July 2020 using the study plan prepared by BFVT Kft., The Urban Planning Department of BFVT Kft., BFVK Zrt. And the Mayor's Office."
1. The couple Gergely Karácsony and Tímea Szabó try to lie to the Mocsáros defense.
2. This is the idea that, according to the head of the trust, László Kiss, the mayor of the district, has a deal with, that residential parks can be built.
3. Sándor Bardóczy also lies in this idea of green development. (Just as the Shipyard Island would be destroyed now if the people of Óbuda did not protest.)
4. For the purpose of this real estate development, a park development has also been prepared (green investment), for which they would like to find funding through the Life tender.
5. This real estate development proposal is hidden from the people of Óbuda.
6. In the interest of this real estate development, the head of the Mocsárosdűlő Association was awarded by the local government led by Gergely Karácsony and László Kiss to assist in the silence.
Material details:
“Mocsárosdűlő part of the city in the III. district, at the foot of Arany-hegy and Üröm-hegy. Its territory is an area bordered by the Aranyhegyi - Border - Szentendre roads and the railway track, with outstanding natural values and a favorable location in terms of urban structure, which is partly provided by public transport by road and rail, high-speed rail and bus.
According to the present analysis, the development area of Mocsárosdűlő is the area that is largely undeveloped, but also has development potential, which is located between the Aranyhegyi út - Határ út - Gladiátor utca - Zsófia utca - Budapest-Esztergom railway line. ”
"The mixed-use neighborhood that can be built in a decade can offer a novel offer in both the housing and office sectors, complemented by commercial and institutional functions."
“With the local development of the main road network (creation of new junctions on Aranyhegyi út) and the creation of the internal side road network (collection roads that also provide bus transport) and the extension of the bus network, the part of the area connected to Aranyhegyi út can be built. With the replacement of the road connection crossing the HÉV level on Szentendrei út, the part of the area east of the district heating pipeline route can also be developed. During the construction of the new road network, the construction of public utilities (water supply, sewage and stormwater drainage, electricity, district heating, gas) must also be ensured. ”
"Without the development of the transport system, the construction of approximately 1,100 flats and 250,000 m2 of gross office space can be established, mainly along Aranyhegyi út."
“In order to further integrate the area of Mocsárosdűlő, it is necessary to implement a special connection between the internal road network of the development area and Szentendrei út with the construction of Gladiátor út and the development of the Pók utca junction. In addition to the development of the road network, in addition to the further intensification of bus services on Pomázi út, high-quality bus transport must also be extended to the interior of the area. ”
️Protect the whole Mocsáros vineyard!
You should also sign the petition:https://www.peticiok.com/vedjuk_meg_a_mocsaros-dlt
I still believe that the whole Mocsáros vineyard must be protected, the ban on alterations must be maintained and the possibility of installation must be eliminated.
What is happening in Budapest?
That explains everything! Csaba Dömötör's speech 2 days before the municipal election!
https://szamokadatok.hu/Post/3800/Mi_tortenik_BudapestenHouse searches have begun in the City Hall case!
Corrupt left-wing politicians may be terrified!
https://szamokadatok.hu/Post/4477/Hazkutatasok_kezdodtek_a_Varoshaza-ugyben
Source:https://www.facebook.com/busofficial/posts/474026200745888
https://szamokadatok.hu/Post/3010/Lebetonozzak_Mocsarosdulot